Being a Reliable Company adding Sustainable Products and Services to all Our Clients around the Globe.
VISION
MISSION
Focus on being largest Exporters of Turnkey Projects. Trade Internationally for all Plastic Processing Machineries.
OUR HISTORY
2021
Design and supply of New Range of Engineering Fittings for Much Larger Pipe Diameters and PP Agriculture Fittings.
2020
Introducing and supply of High speed Double Wall Corrugated Pipe Extrusion Lines for Larger Diameter along with Fitting Solution and rest Technical support.
2019
Turnkey Projects on Larger Diameter Sold Wall Pipe Extrusion Lines.
2018
Introduced 4 Layer PVC Pipes.
2017
Getting in to a Complete Know how of Larger Diameter HDPE Pipes along with Recycling Solutions and Fabricated Fittings.
2016
Started Supplying Raw Materials for all our Plastic Applications based on demand from our Own Machinery Clients.
2015
Set up Turnkey Projects of ROTO Molding Machine for Tanks and furniture. Set up Turnkey projects on Blown Film Extrusion Line.
2014
Set up for 3 Layer PVC Foam Core Pipes.
2013
Introduced Larger Diameter PVC Pipes along with Lab equipment and Online Belling Machines.
2012
Set up for PPR Fittings with Injection Molding Machines.
2011
Set up for PPR Pipes and Composite Pipes. Set up the project on WPC/PVC Foam Boards on turnkey basis.
2010
Set up and Introduction to medium Sizes HDPE Pipes along with Post Processing Machines such as for fabricated fittings and Recycling solutions and Lab Equipments.
2009
Installed PET Project on turnkey basis for Packaged Drinking water.
2004-2008
Experienced and learnt about all Overseas Equipments mainly Cincinnati / Battenfeld / Bausano / Bandera / Krauss-maffei / Amut. Set up the entire Project of Ceiling profiles on turnkey basis.
2003
Set up the New Laboratory for PVC / CPVC / DRIP / HDPE PIPES
2002
Set up the project or PLB Cable Duct Supplied to Government projects.
2001
Experienced, Analyzed and changed all pressure sizing Downstream to Vacuum Sizing for PVC Pipes.
2000
Introduced Elastomeric Sealing Ring Joint for Pressure Applications. Also Drip Irrigation Lines Installed.
1999
Installed and commissioned New HDPE Lines.
1998
We experienced German Technology On Material Saving from INOEX.
1997
Set up and installed new factory for PVC Fittings and SWR Fittings.
1996
We introduced High Output Machine with 450Kgs/Hour for PVC Pipes.
1995
We started with PVC Extrusion Lines for Different Applications Plumbing, Pressure, SWR, Column and Casings.